DCT Petroport was constructed in 2018 on Highway 225 in east Houston. The project brought many construction challenges due to the ten pipeline easements that ran through the 13-acre site. The project consisted of two front load dock high distribution centers totaling 250,000 SF and included LED warehouse lighting and ESFR sprinkler systems.