Phase II of Boulevard Oaks, located in south Houston at the corner of Fuqua and Beltway 8, totaled 1.15 million SF and finished out the 120-acre master-planned industrial park, totalling 1.6 million SF. Phase II consisted of six tilt-wall distribution buildings ranging in size from 110,000 SF to 530,000 SF. Construction included four detention ponds, paving, and site utilities. Burton Construction also constructed Phase I.